Overall Function Check
Use this procedure to check the overall function of the park/neutral position (PNP) switch circuit. During this check, a 1st trip DTC might not be confirmed.
WITH GST
- Turn ignition switch ON.
- Check voltage between ECM terminal 102 (PNP switch signal) and body ground under the following conditions.VOLTAGE SPECIFICATION
Condition (Shift lever) Voltage V (Known good data) P or N position (A/T)
Neutral position (M/T)Approx. 0 Except above position BATTERY VOLTAGE
(11 - 14V) - If NG, go to "DIAGNOSTIC PROCEDURE ".