LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2008 >> Frontier XE >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Engine Control System (Qr25DE) >> Basic Inspection >> Inspection And Adjustment >> Idle Speed and Ignition Timing Check >> Ignition Timing >> Method A
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Method A

  1. Attach timing light to loop wire as shown.
    Fig 1: Attaching Timing Light To Loop Wire
    G05699813Courtesy of NISSAN MOTOR CO., U.S.A.
  2. Check ignition timing.
    Fig 2: Identifying Timing Indicator
    G05699814Courtesy of NISSAN MOTOR CO., U.S.A.