With GST
- Start engine and warm it up to the normal operating temperature.
- Turn ignition switch OFF and wait at least 10 seconds.
- Start engine and keep the engine speed between 3, 500 and 4, 000 RPM for at least 1 minute under no load.
- Let engine idle for 1minute.
- Open engine hood.
- Set voltmeters probes between ECM terminal 76 [HO2S2 (bank 1) signal], 80 [HO2S2 (bank 2) signal] and ground.
- Keep engine speed at 2, 500 RPM constant under no load.
- Make sure that the voltage does not vary for more than 5 seconds. It the voltage fluctuation cycle take less than 5 seconds. Go to
"DIAGNOSIS PROCEDURE ".
- 1 cycle: 0.6 - 1.0 → 0 - 0.3 → 0.6 - 1.0
Courtesy of NISSAN MOTOR CO., U.S.A.