Front Door Request Switch Check
- CHECK FRONT DOOR REQUEST SWITCH
With CONSULT-III
Check front door request switch ("DR REQ SW" or "AS REQ SW") in "DATA MONITOR" mode.
MONITOR ITEM CONDITION CHARTMonitor item Condition DR REQ SW
AS REQ SWFront door request switch is pressed: ON Front door request switch is released: OFF Without CONSULT-III
- Turn ignition switch OFF.
- Check voltage between Intelligent Key unit harness connector M42 terminals 5, 25 and ground.VOLTAGE SPECIFICATION
Connector Item Terminals Condition Voltage (V) (Approx.) (+) (-) M42 Front door request switch LH 5 Ground Door request switch is pressed
↓
Door request switch is released0
↓
Battery voltageFront door request switch RH 25 Fig 1: Checking Voltage Between Intelligent Key Unit Harness Connector M42 Terminals 5, 25 And GroundCourtesy of NISSAN MOTOR CO., U.S.A.
OK or NG
OK: Front door request switch is OK.
NG: GO TO 2.
- CHECK FRONT DOOR REQUEST SWITCH OPERATION
- Turn ignition switch OFF.
- Disconnect front door request switch connector.
- Check continuity between front door request switch terminals 3 and 4.CONTINUITY CHART
Component Terminals Condition Continuity Front door request switch (LH or RH) 3 4 Front door request switch is pressed Yes Front door request switch is released No Courtesy of NISSAN MOTOR CO., U.S.A.
OK or NG
OK: GO TO 3.
NG: Replace front door request switch.
- CHECK FRONT DOOR REQUEST SWITCH GROUND CIRCUIT
Check continuity between front door request switch harness connector D4 (LH), D103 (RH) terminal 4 and ground.
4 - Ground : Continuity should exist.
Fig 3: Checking Continuity Between Front Door Request Switch Harness Connector D4, Terminal 4 And GroundCourtesy of NISSAN MOTOR CO., U.S.A.
OK or NG
OK: GO TO 4.
NG: Repair or replace door request switch ground circuit.
- CHECK FRONT DOOR REQUEST SWITCH CIRCUIT
- Disconnect Intelligent Key unit connector.
- Check continuity between Intelligent Key unit harness connector M42 (A) terminals 5 (LH), 25 (RH) and front door request switch harness connector D4 (B) (LH), D103 (RH) terminal 3.
Driver side 5 - 3 : Continuity should exist.
Passenger side 25 - 3 : Continuity should exist.
- Check continuity between front door request switch harness connector D4 (B) (LH), D103 (RH), terminal 3 and ground.
3 - Ground : Continuity should not exist.
Fig 4: Checking Continuity Between Front Door Request Switch Harness Connector D4, Terminal 3 And GroundCourtesy of NISSAN MOTOR CO., U.S.A.
OK or NG
OK: GO TO 5.
NG: Repair or replace harness between Intelligent Key unit and front door request switch.
- CHECK FRONT DOOR REQUEST SWITCH SIGNAL
- Connect Intelligent Key unit connector.
- Check voltage between front door request switch harness connector D4 (LH), D103 (RH) terminal 3 and ground.
LH: 3 - Ground : Battery voltage
RH: 3 - Ground : Battery voltage
Courtesy of NISSAN MOTOR CO., U.S.A.
OK or NG
OK: Check condition of harness and connector.
NG: Replace Intelligent Key Unit. Refer to "REMOVAL AND INSTALLATION OF INTELLIGENT KEY UNIT ".