LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2009 >> Sentra SE-R >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System - DTCS P0850 To P2A03 (Qr25DE) >> DTC P0850 PNP Switch >> Overall Function Check
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Overall Function Check

Use this procedure to check the overall function of the park/neutral position (PNP) switch circuit. During this check, a 1st trip DTC might not be confirmed.

WITH GST

  1. Turn ignition switch ON.
  2. Check voltage between ECM terminal 102 (PNP switch signal) and ground under the following conditions.
    VOLTAGE REFERENCE CHART

    Condition (Selector lever) Voltage (Known-good data)
    P or N position (CVT)
    Neutral position (M/T)
    Approx. 0 V
    Except above BATTERY VOLTAGE (11 - 14 V)
    Fig 1: Checking Voltage Between ECM Terminal 102 (PNP Switch Signal) And Ground
    G04900583Courtesy of NISSAN MOTOR CO., U.S.A.
  3. If NG, go to "DIAGNOSIS PROCEDURE ".