LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2010 >> Cube Base >> Repair and Diagnosis >> Electrical >> Body Electrical >> Power Control System >> Power Distribution System >> DTC/Circuit Diagnosis >> Push-Button Ignition Switch >> Component Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Component Inspection

  1. CHECK PUSH-BUTTON IGNITION SWITCH
    1. Turn ignition switch OFF.
    2. Disconnect push-button ignition switch connector.
    3. Check continuity between push-button ignition switch terminals.
    CONTINUITY REFERENCE CHART

    Push-button ignition switch Condition Continuity
    Terminal
    4 8 Pressed Existed
    Not pressed Not existed

    Is the inspection result normal? 

    YES: INSPECTION END

    NO: Replace push-button ignition switch. Refer to "REMOVAL AND INSTALLATION ".