LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2010 >> Cube SL >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System - Component Testing >> Ignition Signal >> Component Function Check
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Component Function Check

  1. INSPECTION START

    Turn ignition switch OFF, and restart engine.

    Does the engine start? 

    YES-1: With CONSULT-III: GO TO 2.

    YES-2: Without CONSULT-III: GO TO  3.

    NO: Go to "DIAGNOSIS PROCEDURE ".

  2. IGNITION SIGNAL FUNCTION

    With CONSULT-III 

    1. Perform "POWER BALANCE" in "ACTIVE TEST" mode with CONSULT-III.
    2. Make sure that each circuit produces a momentary engine speed drop.

    Is the inspection result normal? 

    YES: INSPECTION END

    NO: Go to "DIAGNOSIS PROCEDURE ".

  3. IGNITION SIGNAL FUNCTION

    Without CONSULT-III 

    1. Let engine idle.
    2. Read the voltage signal between ECM harness connector and ground.
    TERMINAL VOLTAGE REFERENCE CHART

    ECM Ground Voltage signal
    Connector Terminal
    F10 17 Ground
    G04926268Courtesy of NISSAN MOTOR CO., U.S.A.
    18
    21
    22
    NOTE: The pulse cycle changes depending on RPM at idle.

    Is the inspection result normal? 

    YES: INSPECTION END

    NO: Go to "DIAGNOSIS PROCEDURE ".