LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2012 >> Murano CrossCabriolet >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System - Component Testing (CROSSCABRIOLET) >> Periodic Maintenance >> Ignition Timing >> Work Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Work Procedure

  1. CHECK IGNITION TIMING
    1. Attach timing light to loop wires as shown in the figure.
      • Timing light (A)
      • <==: Vehicle front
        Fig 1: Identifying Timing Light
        G08428946Courtesy of NISSAN NORTH AMERICA, INC.
    2. Check ignition timing.

      INSPECTION END

      Fig 2: Identifying Timing Indicator
      G08428947Courtesy of NISSAN NORTH AMERICA, INC.