LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2012 >> Quest LE >> Repair and Diagnosis >> Electrical >> Charging Systems >> Basic Inspection >> Charging System Preliminary Inspection >> Inspection Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Inspection Procedure

  1. CHECK BATTERY TERMINALS CONNECTION

    Check if battery terminals are clean and tight.

    Is the inspection result normal? 

    YES: GO TO 2.

    NO: Repair battery terminals connection.

  2. CHECK FUSE

    Check for blown fuse and fusible link.

    Unit Power source (Power supply terminals) Fuse No.
    Alternator Battery ("S" terminal) 38
    Combination meter Ignition switch ON ("L" terminal) 4

    Is the inspection result normal? 

    YES: GO TO 3.

    NO: Be sure to eliminate the cause of malfunction before installing new fuse.

  3. CHECK "E" TERMINAL CONNECTION (ALTERNATOR GROUND)

    Check if "E" terminal (alternator ground) is clean and tight.

    Is the inspection result normal? 

    YES: GO TO 4.

    NO: Repair "E" terminal (alternator ground) connection.

  4. CHECK DRIVE BELT TENSION

    Check drive belt tension. Refer to "CHECKING ".

    Is the inspection result normal? 

    YES: INSPECTION END

    NO: Repair as needed.