Additional Service When Using Telematics System For The First Time/Re-Subscription: Procedure
- CHECK TCU CONTRACT
Check the contract of TCU.
Is this the recontract?
YES
GO TO STEP 2 .
NO
GO TO STEP 7 .
- CHECK THE SETTINGS OF TCU ACTIVATION
CONSULT work support
Select "TCU ACTIVATE SETTING" to check its settings.
Is the ACTIVATE setting ON?
YES
GO TO STEP 3 .
NO
GO TO STEP 7 .
- INITIALIZE TCU
CONSULT work support
Select "TCU ACTIVATE SETTING". Change the setting of TCU activate from OFF to ON.
- Check the status of the SOS indicator for 30 seconds.
Does the SOS indicator turn ON?
YES
GO TO STEP 8 .
NO
GO TO STEP 4 .
- CHECK THE STATUS OF TCU
Press the operator switch.
The voice guidance of "It is out of service. Please try again." can be heard with the indicator lamp remained OFF.
Move to within a service area (where the indicator lamp turns ON) of the cellular phone to restart the test.
The indicator lamp blinks ten times.
GO TO STEP 5 .
- PERFORM SELF - DIAGNOSIS OF CONSULT
Perform self - diagnosis of CONSULT.
IS DTC detected?
YES
Repair or replace malfunctioning parts, according to the self - diagnosis results.
NO
GO TO STEP 6 .
- CHECK THE SETTINGS OF TCU ACTIVATION
CONSULT work support
Select "TCU ACTIVATE SETTING" to check its settings.
Is the activate setting ON?
YES
Replace TCU. Refer to REMOVAL AND INSTALLATION .
NO
GO TO STEP 3 .
- TCU ACTIVATION
CONSULT work support
Select "TCU ACTIVATE SETTING", then "ON" on changing screen to activate TCU.
GO TO STEP 8 .
- CONFIRMATION OF OPERATION
- After turning ON TCU, wait for 30 seconds to perform the procedure.
- Operate the telematics switch to check that the connection to the operator is established.NOTE:
If the connection to the operator cannot be established, check that the ID confirmed with CONSULT agrees with the one registered with the NISSAN CONNECTSM operation system.
Is communication test result normal?
Abnormal
GO TO STEP 1 .
Normal
operation end.