Diagnosis Procedure
Regarding Wiring Diagram information, refer to WIRING DIAGRAM .
- CHECK DTC OF COMBINATION METER
Check DTC in "Self Diagnostic Result" mode of "METER/M&A" using CONSULT.
Refer to DTC INDEX .
Is the inspection result normal?
YES
GO TO STEP 2 .
NO
Repair or replace the malfunctioning parts.
- CHECK FUSE
- Turn power switch OFF.
- Check that the following fuse in the fuse block (J/B) is not blown.
Signal name Fuse No. Ignition power supply 3 (10 A)
Is the inspection result normal?
YES
GO TO STEP 3 .
NO
Replace the blown fuse after repairing the cause of blowing.
- CHECK PARK/NEUTRAL POSITION SWITCH POWER SUPPLY
- Turn ignition switch OFF.
- Disconnect park/neutral position switch connector.
- Turn ignition switch ON.
- Check voltage between park/neutral position switch harness connector and ground.
(+) (-) Voltage (V)
(Approx.)Park/neutral position switch Connector Terminal F52 2 Ground Battery voltage
Is the inspection result normal?
YES
GO TO STEP 4 .
NO
Repair or replace harness.
- CHECK PARK/NEUTRAL POSITION SWITCH INPUT SIGNAL
- Turn ignition switch OFF.
- Connect park/neutral position switch connector.
- Turn ignition switch ON.
- Check voltage between BCM harness connector and ground.
(+) (-) Condition Voltage BCM Connector Terminal M83 69 Ground Shift lever Neutral position Battery voltage Except neutral position 0 - 1.5 V
Is the inspection result normal?
YES
GO TO STEP 5 .
NO
GO TO STEP 6 .
- REPLACE BCM
- Replace BCM. Refer to REMOVAL AND INSTALLATION .
- Perform initialization of BCM and registration of all Intelligent Keys using CONSULT.
Inspection End
- CHECK PARK/NEUTRAL POSITION SWITCH SIGNAL CIRCUIT
- Turn ignition switch OFF.
- Disconnect park/neutral position switch connector.
- Disconnect BCM connector.
- Check continuity between park/neutral position switch harness connector and BCM harness connector.
Park/neutral position switch BCM Continuity Connector Terminal Connector Terminal F52 3 M83 69 Yes
Is the inspection result normal?
YES
GO TO STEP 7 .
NO
Repair or replace harness.
- CHECK PARK/NEUTRAL POSITION SWITCH
Refer to COMPONENT INSPECTION .
Is the inspection result normal?
YES
GO TO STEP 8 .
NO
Replace park/neutral position switch. Refer to REMOVAL AND INSTALLATION (With 6MT: RS6F94R).
- CHECK INTERMITTENT INCIDENT
Refer to INTERMITTENT INCIDENT .
Inspection End