DTC Diagnosis Procedure
Regarding Wiring Diagram information, refer to appropriate system wiring diagram.
- CHECK FUSES AND FUSIBLE LINK
Check that the following fuses and fusible link are not blown.
Terminal No.
Signal name
Fuses and fusible link No.
57
Battery power supply
12 (10A)
70
G (40A)
Is the fuse blown?
YES
Replace the blown fuse or fusible link after repairing the affected circuit.
NO
GO TO 2 .
- CHECK POWER SUPPLY CIRCUIT
- Disconnect BCM connector M99.
- Check voltage between BCM connector M99 and ground.
BCM
Ground
Voltage
Connector
Terminal
M99
57
-
Battery voltage
70
Is the inspection result normal?
YES
GO TO 3 .
NO
Repair harness or connector.
- CHECK GROUND CIRCUIT
Check continuity between BCM connector M99 and ground.
BCM
Ground
Continuity
Connector
Terminal
M99
67
-
Yes
Is the inspection result normal?
YES
Inspection End.
NO
Repair harness or connector.