LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2021 >> Sentra SR >> Repair and Diagnosis >> Brakes >> Brakes Control Systems >> Chassis Control System >> Basic Inspection >> Additional Service When Replacing Chassis Control Module (With Built In Steering Angle Sensor) >> Work Procedure >> After Replacing Chassis Control Module
April 5, 2026: LEMON Manuals is launched! Read the announcement.

After Replacing Chassis Control Module

  1. CHECK "OPERATION LOG" 

    SYMBOL With CONSULT

    Check "Operation Log" saved before replacing the chassis control module, according to the procedure of "Programming" in CONSULT Operation Manual.

    NOTE: For the vehicle that the programming is to be performed, check if "Operation Log" of Vehicle Identification Number (VIN) is in Saved Data List.

    Is there an applicable Operation Log in the Saved Data List?

    YES

    GO TO 2.

    NO

    GO TO 3.

  2. PERFORM CHASSIS CONTROL MODULE PROGRAMMING 

    SYMBOL With CONSULT

    Perform chassis control module programming, according to "Programming" of CONSULT Operation Manual. Refer to CONSULT Operation Manual.

    CAUTION: During programming, maintain the following conditions:
    • Ignition switch: ON
    • Electric load: OFF
    • Brake pedal: Not depressed
    • 12 V battery voltage: 12 - 13.5 V (Check the value displayed on the CONSULT screen.)

    GO TO 5.

  3. READ IN CHASSIS CONTROL MODULE PART NUMBER BY EPC LINKED 

    Obtain chassis control module part number by EPC (service parts catalog), according to the procedure of EPC linked in CONSULT Operation Manual. Refer to CONSULT Operation Manual.

    CAUTION: Be sue select "EPC linked".
    NOTE: "EPC linked" allows an appropriate programming by obtaining ECU part number from EPC (service parts catalog) even when the part number cannot be obtained from the old ECU used before replacing with a new one.

    GO TO 4.

  4. PERFORM PROGRAMMING (EPC LINKED) 

    SYMBOL With CONSULT

    Perform chassis control module programming according to the procedure of EPC linked in CONSULT Operation Manual. Refer to CONSULT Operation Manual.

    CAUTION: During programming, maintain the following conditions:
    • Ignition switch: ON
    • Electric load: OFF
    • Brake pedal: Not depressed
    • 12 V battery voltage: 12 - 13.5 V (Check the value displayed on the CONSULT screen.)

    GO TO 5.

  5. PERFORM NECESSARY WORK 
    1. Perform self-diagnosis for "CHASSIS CONTROL".
    2. Erase the memory of self-diagnosis results.

    End of work.