LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Peugeot >> 1987 >> 505 L4-1971cc XN >> Repair and Diagnosis >> Powertrain Management >> Computers and Control Systems >> Relays and Modules - Computers and Control Systems >> Main Relay (Computer/Fuel System) >> Testing and Inspection
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Main Relay (Computer/Fuel System): Testing and Inspection

Fig. 18 ECU connector pin # 8:




Fig. 19 ECU relay:





1. Remove connector from ECU
2. Connect the tachymetric bypass harness and activate switch.
3. Connect a voltmeter between pin 8 of the connector, Fig. 18, and the vehicle ground. Voltage reading should be above 12 volts.
4. If incorrect, check the operation of the ECU relay (M748), Fig. 19, and the electrical circuit continuity.