LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Pontiac >> 2003 >> Aztek AWD >> Repair and Diagnosis >> General Information >> OBD-II Drive Cycles - 2001-03 >> Inspection/Maintenance (I/M) Complete System Set Procedure >> Drive Cycle >> Description
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Drive Cycle: Description

The following procedure is designed to satisfy the enable criteria necessary to execute all of the I/M readiness diagnostics, and complete the trips for those particular diagnostics. When all diagnostic tests are completed, the I/M System Status indicators are set to YES. Perform this test when more than one or all of the I/M System Status indicators are set to NO.

Rough road conditions may prevent some of the tests from running. Extreme high or low ambient temperatures may prevent tests such as Heated Oxygen Sensor (HO2S) heater and Evaporative Emission (EVAP) system from initiating. If a step is interrupted before completion, perform the remaining portion of the set procedures. Any portion of the set procedure that requires the engine at operating temperature may be repeated. This allows most of the diagnostics to run and the remaining tests can be performed using the individual System Set Procedures.

If the vehicle has recently run, start the Drive Cycle Procedure at step 3. This will allow the tests that require the engine at operating temperature to run. Using this method allows shorter cool down periods if the tests requiring a cold start do not initiate.

The scan tool can be used to monitor each of the I/M System Status indicators during the Drive Cycle Procedure. When all of the indicators for a test step have updated to YES, testing can move on to the next step even if the remaining portion of the test is not complete. For example, step 3 is designed to run the Evaporative Emission (EVAP), Secondary Air Injection (AIR), and Heated Oxygen Sensor (HO2S) tests. The procedure instructs the technician to operate the vehicle in the enable conditions for 6 minutes. If all 3 tests have updated to YES within 4 minutes, it is not necessary to continue with the enable conditions and testing can advance to the next step.