Circuit/System Testing
- Ignition OFF, disconnect the ECM harness connector X1.
- Ignition ON, load test for B+ between the ECM harness connector terminal X1-3 and ground.
- If less than the specified range, remove the EC relay and test the ignition 1 voltage circuit for an open/high resistance. If the circuit tests normal, replace the relay.
- Load test for B+ between the ECM harness connector terminal X1-14 and ground.
- If less than the specified range, repair the ignition 1 voltage circuit for an open/high resistance.
- If all circuits test normal, replace the ECM.