Procedure For Coding The Instrument Cluster
- Connect the PST2 to the diagnostic socket; switch on the PST2 and the ignition.
- In the menu "Control units", select Instrument cluster
- In the function selection, select Coding.
- Select menu item Country coding.
- Select the respective country and code with F8 key. The other menu items are described in CONTROL UNIT REPLACEMENT
.NOTE: In general, the K-number is adjusted when coding the instrument cluster. However, this point must be checked again when coding is complete, as described under PROCEDURE for changing the "K-number" in the instrument cluster (as of PST2 software 13.0):
PROCEDURE for changing the "K-number" in the instrument cluster (as of PST2 software 13.0):
- In the function selection, select Synchronize K-number.
- Start the function using the key >>.
- After the function has been successfully performed in the instrument cluster, the message K-number synchronized or the message K-number updated appears in the Tester display. If the K-number is not updated, a connection to the PCM is set up automatically. The message Connecting to PCM appears.
- Then the message Function successfully completed appears.
- Return to the Start menu with the button ESC, switch off the PST2 and disconnect from the diagnostic socket.