LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Saab >> 2002 >> 9-3 SE, 2D Convertible, Standard >> Repair and Diagnosis >> Engine Performance >> System >> Engine Controls - System/Component Tests >> Test Readings, Control Module Connections >> Electronic Control Module >> Ground Circuit
September 30: LEMON manuals is back up on a temporary server! Slowness is possible

Ground Circuit

  1. Turn ignition off. Measure resistance between specified ECM terminal and ground. See GROUND TERMINAL IDENTIFICATION . Resistance should be zero ohms. If resistance is as specified, go to next step. If resistance is not as specified, repair open circuit between ECM and ground. See WIRING DIAGRAMS article.
  2. Start engine. Measure voltage between specified ECM terminal and ground. See Figure. If one volt or more is present, inspect for open circuit, corrosion, or loose connection on appropriate circuit.
GROUND TERMINAL IDENTIFICATION

Engine Terminal (Wire Color)
2.0L & 2.3L No. 25 (Black), 47 (Black) & 62 (Black)
3.0L No. 25 (Black) & 47 (Black)