Installation Procedure
- Install the hydraulic modulator.
Tighten: Tighten the 3 hydraulic modulator bolts to 8 N.m (71 lb in).
- Remove the 6 sealing plugs from the hydraulic modulator.
- Install the 6 hydraulic lines.
Tighten: Tighten the 6 hydraulic lines retaining bolts to 14 N.m (124 lb in).
- Connect the hydraulic modulator wiring harness plug.
- Install the coolant surge tank to the mounting.
Connect the wiring harness plug for the coolant level sensor.
- Install the battery support.
Tighten: Tighten the 3 battery support bolts to 10 N.m (89 lb in).
- For diesel engines, install the preheater system control unit.
- Install the wiring harness plug.
- Install the coolant hose.
- Install the wiring harness.
Install the 2 cable ties.
- Install the battery.
- Install the battery bracket.
Tighten: Tighten the battery bracket bolt to 15 N.m (11 lb ft).
- If present, install the thermal protection.
- Install the battery positive connection to the positive terminal.
Tighten: Tighten the battery positive connection nut to 5 N.m (44 lb in).
- Install the battery ground connection to the ground terminal.
Tighten: Tighten the battery ground connection nut to 5 N.m (44 lb in).
- Install the battery bracket.
- Bleed the brake system. Refer to Hydraulic Brake System Bleeding .
- Top up the brake fluid reservoir to the MAX marking.
- Install the cover onto the brake fluid reservoir.
- For programming procedures, refer to Control Module References .
NOTE:
Refer to Fastener Notice
.