Installation Procedure
- Install the positive battery cable to the vehicle and position accordingly.
- Install the positive battery cable (1) to the starter solenoid BAT stud.
Tighten: Tighten the nut (4) to 15 N.m (11 lb ft).
- Lower the vehicle.
- Position the fusible link cable to the generator control module.
- Install the following components to the generator control module.
- Fusible link nut (1)
- Fusible link bolt (2)
Tighten: Tighten the nuts and bolts to 10 N.m (89 lb in).
- Install the generator control module cover. Refer to Generator Control Module Cover Replacement .
- Install the positive battery cable to the battery.
Tighten: Tighten the nut to 5 N.m (45 lb in).
- Install the electronic control module bracket retaining nuts (1) and bolts (2).
Tighten: Tighten the nuts and bolts to 10 N.m (89 lb in).
- Connect the positive battery junction block assembly to the bracket.
- Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (With LAT) or Battery Negative Cable Disconnection and Connection (Without LAT) .
IMPORTANT:
Route the positive battery cable the same way as originally installed.
NOTE:
Refer to Fastener Notice
.