Repair Verification
- Turn the nitrogen/smoke valve to nitrogen.
- Command the EVAP vent valve closed with a scan tool.
- Use the remote switch to activate the J 41413-200
. See Special Tools
.
- Use the remote switch to introduce nitrogen and fill the EVAP system until the floating indicator stabilizes.
- Verify the flow meter's stable floating indicator position is at or below the red flag.
- Remove the CH-48096
, and connect the purge line to the EVAP purge solenoid. See Special Tools
.
- Clear the DTCs with a scan tool.