LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Scion >> 2009 >> xB Standard >> Repair and Diagnosis >> Accessories & Equipment >> Cruise Control Systems >> Cruise Control System >> Cruise Main Indicator Light Circuit >> Inspection Procedure
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Inspection Procedure

  1. PERFORM ACTIVE TEST USING TECHSTREAM 
    1. Connect the Techstream to the DLC3.
    2. Turn the ignition switch to ON.
    3. Turn the Techstream on.
    4. Enter the following menus: Body Electrical / Combination Meter / Active Test.
    5. Check the CRUISE main indicator light by performing the Active Test.
      1. Combination Meter 
        DATA LIST

        Tester Display Test Part Control Range Diagnostic Note
        Indicat Lamp Cruise Turns CRUISE main indicator light ON/OFF -

        OK: Indicator light comes on/goes off. 

    NG : REPLACE COMBINATION METER  (See REMOVAL )

    OK: Go to next step. 

  2. READ VALUE USING INTELLIGENT TESTER OR TECHSTREAM 
    1. Connect the Techstream to the DLC3.
    2. Turn the ignition switch to ON.
    3. Turn the Techstream on.
    4. Enter the following menus: Powertrain / Cruise Control / Data List.
    5. According to the display on the Techstream, read the "Data List".
      1. Cruise control 
        DATA LIST

        Tester Display Measurement Item/Range Normal Condition Diagnostic Note
        CCS Indicator M-CPU Cruise indicator signal (Main CPU)/ON or OFF ON "CRUISE" on
        OFF "CRUISE" off
        -

        OK: When cruise control main switch operation is performed, the result will be same as above. 

    NG : REPLACE ECM  (See REMOVAL )

    OK : PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN  PROBLEM SYMPTOMS TABLE  .