LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Scion >> 2009 >> xD Standard >> Repair and Diagnosis >> Accessories & Equipment >> Cruise Control Systems >> Cruise Control System >> Cruise Main Indicator Light Circuit >> Inspection Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Inspection Procedure

  1. PERFORM ACTIVE TEST USING TECHSTREAM 
    1. Connect the Techstream to the DLC3.
    2. Turn the ignition switch to ON.
    3. Turn the tester on.
    4. Enter the following menus: Body Electrical/ Combination Meter / Active Test.
    5. According to the display on tester, perform the "ACTIVE TEST".

      Combination Meter 

      ACTIVE TEST - COMBINATION METER

      Tester Display Test Part Control Range Diagnostic Note
      Indicat Lamp Cruise Turns on CRUISE main indicator light ON/OFF -

      OK: 

      Indicator light comes on/goes off. 

    NG: REPLACE COMBINATION METER  (See REMOVAL )

    OK: Go to next step 

  2. READ VALUE USING TECHSTREAM 
    1. Connect the Techstream to the DLC3.
    2. Turn the ignition switch to ON.
    3. Turn the tester on.
    4. Enter the following menus: Powertrain / Cruise Control / Data List.
    5. According to the display on tester, read the "DATA LIST".

      Cruise control 

      DATA LIST - CRUISE CONTROL

      Tester Display Measurement Item/Range Normal Condition Diagnostic Note
      CCS Indicator M-CPU Cruise indicator signal (Main CPU)/ON or OFF ON "CRUISE" on
      OFF "CRUISE" off
      -

      OK: 

      When cruise control main switch operation is performed, the result will be same as above. 

    NG: REPLACE ECM  (See REMOVAL )

    OK : PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE  (See PROBLEM SYMPTOMS TABLE  )