LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Subaru >> 1985 >> XT DL >> Labor Times >> Engine Mechanical >> Mechanical >> Valve >> Grind Complete
September 30: LEMON manuals is back up on a temporary server! Slowness is possible

Grind Complete

Includes: R&I Engine Assembly (where noted). Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats, clean Valve Guides, adjust Valves.

Applies ToNoteStandard HoursWarranty HoursSkill Level
Normally Aspirated, Both10.8A
Additional Procedure: VALVE: Grind Complete:
Refer to Additional Times following Cylinder Head Gasket - R&R.A
Combination Procedure: CYLINDER HEAD STUD: Remove & Replace:
Each0.1B
Combination Procedure: VALVE GUIDE: Remove & Replace:
Each Additional0.2A
One0.3A