LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Subaru >> 2003 >> Outback F6-3.0L >> Repair and Diagnosis >> Engine, Cooling and Exhaust >> Engine >> Service and Repair >> Disassembly and Assembly >> Preparation For Overhaul
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Preparation For Overhaul

Preparation for Overhaul

REMOVAL
1. Remove engine from body.





2. After removing engine from body, install ST onto engine.
ST 18232AA000 ENGINE STAND
3. Remove sensors, pipes, and hoses installed on engine before starting overhaul.
a. Remove intake manifold.
b. Remove generator.
c. Remove A/C compressor.
d. Remove EGR pipe.
e. Remove water pipe and hoses.
f. Remove engine harness.
g. Remove spark plugs.
h. Remove camshaft position sensor.
i. Remove crankshaft position sensor.
j. Remove knock sensor.
11. Remove engine coolant temperature sensor.
12. Remove oil pressure switch.
13. Remove oil filter.
14. Remove oil cooler.