Intake Manifold: Installation
- Install the intake manifold onto cylinder heads.NOTE: Replace with a new gasket.
Tightening torque:
25 N.m (2.5 kgf-m, 18.1 ft-lb)
- Connect the fuel delivery hose, return hose, and evaporation hose.
- Connect the connector to the engine coolant temperature sensor (A), oil pressure switch (B) and crankshaft position sensor (C).
- Connect the connector to the knock sensor.
- Connect the connectors to camshaft position sensor.
- Connect the connector to the ignition coil.
- Connect the engine harness with clip (A) to the bracket.
- RH side
- LH side
- Connect the engine harness connectors to bulkhead harness connectors.
- Connect the brake booster vacuum hose.
- Connect the engine coolant hoses to throttle body.
- Connect the emission hose (A) and the connector (B) to the PCV hose assembly.
- Connect the pressure hose to the intake duct.
- Install the power steering pump.
- Install the reservoir tank to the bracket.
- Connect the connector to power steering pump switch.
- Install the power steering pump, and tighten the bolts.
Tightening torque:
22 N.m (2.2 kgf-m, 15.9 ft-lb)
- Install the power steering pipe bracket onto the right side intake manifold.
- Install the front side V-belts. <Ref. to INSTALLATION V-belt.>
- Install the coolant filler tank.
<Ref. to INSTALLATION Coolant Filler Tank.>
- Install the intercooler. <Ref. to INSTALLATION Intercooler.>
- Install the air cleaner element.
- Install the air cleaner upper cover and air intake duct as a unit. <Ref. to INSTALLATION Air Cleaner Case.>
- Connect the connector to fuel pump relay.
- Install the collector cover.
- Connect the ground cable to battery.
- Lift-up the vehicle.
- Install the under cover.
- Fill engine coolant.
<Ref. to FILLING OF ENGINE COOLANT REPLACEMENT, Engine Coolant.>