LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Subaru >> 2010 >> Outback R >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Fuel Injection System - Fuel Injection (Fuel Systems) (H6DO - 3.6L DOHC) >> Main Relay >> Inspection
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Main Relay: Inspection

  1. Check that the main relay has no deformation, cracks or other damages.
  2. Measure the resistance between main relay terminals.
    Fig 1: Measuring Resistance Between Main Relay Terminals
    G06344745Courtesy of SUBARU OF AMERICA, INC.
    TERMINAL RESISTANCE REFERENCE CHART

    Terminal No. Standard
    1 and 2 1 MΩ or more
    3 and 4 130.4 - 230.8 0 (When 20°C (68°F))
  3. Connect battery positive terminal to terminal No. 3 and battery ground terminal to terminal No. 4, and measure the resistance between the main relay terminals.
    Fig 2: Connecting Battery Positive Terminal To Terminals And Battery Ground
    G06344746Courtesy of SUBARU OF AMERICA, INC.
    TERMINAL REFERENCE CHART

    Terminal No. Standard
    1 and 2 Less than 1 Ω