Intake Duct: Installation
WARNING: This page is about a different variant/trim than selected.
- Install the PCV hose assembly onto the intake duct.NOTE: Use a new clamp for the PCV hose assembly, fit the cut out in the ST with the protrusion on the clamp as shown in the illustration, and lock the clamp.
ST 18353AA000 CLAMP PLIERS
- Install the intake duct to the intake manifold.
Tightening torque:
17 N.m (1.7 kgf-m, 12.5 ft-lb)
- Install the sensor, engine harness and fuel pipe to the intake manifold. < Ref. to ASSEMBLY , Intake Manifold . >
- Install the intake manifold. < Ref. to INSTALLATION , Intake Manifold . >
- Connect the battery ground terminal.
- Install the collector cover.