October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Grind Complete
Includes: R&I Engine Assembly (where noted). Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats, clean Valve Guides, adjust Valves.
| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
| Automatic Trans, All | Includes: R&I Engine Assembly.
Includes: Recover, Evacuate and Recharge Air Conditioning System. | 23.4 | | A |