September 30: LEMON manuals is back up on a temporary server! Slowness is possible
Power Window Control Switch: Inspection: Sub-Switch
- Remove the switch - power window sub front.
- Check the resistance between terminals of the switch - power window sub front.
Courtesy of SUBARU OF AMERICA, INC.
| |
Terminal No. |
Inspection conditions |
Standard |
| Passenger seat, rear |
6 - 5 8 - 7 |
UP |
Less than 1 Ω |
7 - 6 4 - 6 |
OFF |
1 MΩ or more |
5 - 4 8 - 7 |
Less than 1 Ω |
6 - 8 5 - 4 |
DOWN |
Less than 1 Ω |
- If the inspection result is not within the standard, replace the switch - power window sub front.