LEMON Manuals
: Even more car manuals for everyone: 1960-2025
Home
>>
Subaru
>>
2021
>>
Outback Base
>>
Repair and Diagnosis
>>
General Information
>>
Identification
>>
General Information & Specifications
>>
Pre-Delivery Inspection
>>
Pre-Delivery Inspection (PDI) Procedure
>>
Accessory Power Supply Socket
July 1:
So it begins
. Don't worry, this is not in the correct legal jurisdiction!
Accessory Power Supply Socket
Check operation of the power supply socket in glove box.
Check operation of the accessory power supply sockets in the console box and the luggage room.