September 30: LEMON manuals is back up on a temporary server! Slowness is possible
Transaxle Control Module (TCM) Installation
- Install the TCM and nuts.
Tighten:
Tighten the TCM mounting nuts to 23 N.m (17 lb-ft).
- Connect the wiring connectors.
- Connect the negative battery cable.
Courtesy of SUZUKI OF AMERICA CORP.