Installation (CRESSIDA & Supra)
- Install new grommets and "O" rings on injectors. Install injectors on fuel rails. Install 6 insulators and 3 spacers on intake manifold.
- Install injectors with fuel rail into intake manifold. Ensure injectors rotate smoothly. If injectors do not rotate smoothly, check "O" rings for proper installation. Position injector connectors upward. Install 3 fuel rail bolts.
- Install fuel pressure regulator. Install front fuel pipe. Connect fuel hose. Install rear fuel pipe with vacuum switching valve and connect fuel hose.
- Connect pipe to fuel rail with union bolt (7M-GE) or pulsation damper (7M-GTE). Connect injector connectors. Connect cold start injector tube to fuel rail. Install idle speed control valve.
- On 7M-GTE, install throttle body.
- On 7M-GE, install air intake connector. To complete installation, reverse removal procedure. See TORQUE SPECIFICATIONS TABLE - CRESSIDA & SUPRA .