LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Toyota >> 1996 >> T100 Base, 2D Pickup, Standard >> Repair and Diagnosis >> Engine Performance >> Remove, Overhaul & Install >> Engine Controls - Remove/Install/Overhaul >> Emission Systems & Sub-Systems >> EGR Valve >> Removal & Installation (2WD 1/2 Ton)
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Removal & Installation (2WD 1/2 Ton)

  1. Drain cooling system. Disconnect coolant hose and vacuum hose at EGR valve. Remove EGR pipe and gaskets. Remove EGR valve.
  2. To install, reverse removal procedure. Tighten bolts/nuts to specification. See TORQUE SPECIFICATIONS  table. Fill cooling system.