Inspection Procedure
- CHECK IGNITION OR STARTER SWITCH ASSY
- Check the ignition switch.
Standard:
IGNITION OR STARTER SWITCH ASSEMBLY CHECKTerminal No. Switch position Specified condition - LOCK - 1 <=> 3 ACC Continuity 1 <=> 2 <=> 3 5 <=> 6 ON Continuity 1 <=> 2 <=> 4 <=> 5 <=> 6 START Continuity
NG: REPAIR OR REPLACE IGNITION OR STARTER SWITCH ASSY
OK: Go to next step
- Check the ignition switch.
- CHECK FUSE (ECU-B)
- Remove the fuse from the instrument panel J/B.
- Check the continuity of the fuse.
Standard: Continuity
NG: REPLACE FUSE
OK: Go to next step
- CHECK RELAY (Marking: IG1)
- Remove the relay from the instrument J/B.
- Inspect the relay continuity.
Standard:
RELAY CONTINUITY CHECKTerminal No. Condition Specifed condition 1 <=> 2 Constant Continuity 3 <=> 5 Apply B+ between terminals 1 and 2 Continuity
NG: REPLACE RELAY
OK: Go to next step
- CHECK TVIP ECU
- Disconnect the TVIP ECU connector.
- Turn the ignition switch ON.
- Measure the voltage between the terminal of the ECU connector and the body ground.
Standard:
TVIP ECU CHECKSymbols (Terminal No.) Specified condition IG (T3-10) <=> Body ground 10-14 V
NG: REPAIR OR REPLACE WIRE HARNESS AND CONNECTOR
OK: CHECK AND REPLACE TVIP ECU (See ELECTRONIC CIRCUIT INSPECTION PROCEDURE .