  1. Install Rotor To Drive End Frame 
      Fig 1: Installing Rotor To Drive End Frame
      G01101568Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    1. Place the rectifier end frame on the pulley.
    2. Install the rotor to the rectifier end frame.
  2. Install Rectifier End Frame 
      Fig 2: Installing Rectifier End Frame
      G01101569Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    1. Place the thrust washer on the rotor.
    2. Using a 29 mm socket wrench and press, slowly press in the rectifier end frame.
      Fig 3: Using Socket Wrench To Press In Rectifier End Frame
      G01101570Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. NUT A:
      1. Install the cord clip and 4 nuts.
      2. Torque: 4.5 N.m (46 kgf.cm, 40 in.lbf) 
    4. NUT B:
      1. Install the cord clip and 4 nuts.
      2. Torque: 5.4 N.m (55 kgf.cm, 48 in.lbf) 
      Fig 4: Installing Cord Clip & Nuts
      G01101571Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    5. Install the wire clamp.
  3. Install Pulley 
    1. Install the pulley to the rotor shaft by tightening the pulley nut by hand.
    2. Hold SST (A) with a torque wrench, and tighten SST (B) clockwise to the specified torque.

      SST 09820-63011

      Fig 5: Using SSTs To Install Pulley (1 Of 4)
      G01101572Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 39 N.m (400 kgf.cm, 29 ft.lbf) 

    3. Check that SST (A) is secured to the pulley shaft.
    4. Mount SST (C) in a vise.
    5. Insert SST (B) into SST (C), and attach the pulley nut to SST (C).
      Fig 6: Using SSTs To Install Pulley (2 Of 4)
      G01101573Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    6. To torque the pulley nut, turn SST (A) in the direction shown in the illustration.
      Fig 7: Using SSTs To Install Pulley (3 Of 4)
      G01101574Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 110.5 N.m (1,125 kgf.cm, 81 ft.lbf) 

    7. Remove the generator from SST (C).
    8. Turn SST (B), and remove SST (A and B).
      Fig 8: Using SSTs To Install Pulley (4 Of 4)
      G01101575Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  4. Install Rectifier Holder 
    1. Place the seal plate on the rectifier end frame.
      Fig 9: Installing Rectifier Holder
      G01101576Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the 4 rubber insulators on the lead wires.
      Fig 10: Installing Rubber Insulators On Lead Wires
      G01101577Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Install the rectifier holder with the 4 screws.
      Fig 11: Installing Rectifier Holder
      G01101578Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 2.9 N.m (30 kgf.cm, 26 in.lbf) 

  5. Install Voltage Regulator And Brush Holder 
      Fig 12: Installing Voltage Regulator & Brush Holder
      G01101579Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    1. Place the voltage regulator and brush holder on the rectifier end frame.
      NOTE: Be careful of the holder installation direction.
    2. Install the 5 screws.

      Torque: 2.0 N.m (20 kgf.cm, 18 in.lbf) 

    3. Place the brush holder cover on the brush holder.
      Fig 13: Installing Brush Holder Cover
      G01101580Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  6. Install Rear End Cover 
    1. Install the end cover and plate terminal with the 3 nuts and screw.
      Fig 14: Installing End Cover & Plate Terminal
      G01101581Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      1. Torque: 
      2. Screw: 3.9 N.m (39 kgf.cm, 35 in.lbf) 
      3. Nut: 4.4 N.m (45 kgf.cm, 39 in.lbf) 
    2. Install the terminal insulator with the nut.
      Fig 15: Installing Terminal Insulator
      G01101582Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 4.1 N.m (41.5 kgf.cm, 36 in.lbf) 

  7. Check That Rotor Rotates Smoothly