Inspection Procedure
WARNING: This page is about a different car, the 2003 Toyota Sequoia. However, it is still accessible from the selected car via links, so may be relevant.
NOTE:
If not using the TOYOTA hand-held tester, start from STEP 2.
- Perform active test.
PREPARATION:
- Connect the TOYOTA hand-held tester to the DLC3.
- Turn ignition switch ON and TOYOTA hand-held tester main switch ON.
- Select the ACTIVE TEST mode on the TOYOTA hand-held tester.
CHECK:
Check that "Slide roof motor" operates as the TOYOTA hand-held tester directs.
NOTE: Caution is necessary for a part of body not to be caught in as the jam protection system does not operate during conducting ACTIVE TEST.NOTE: With one ACTIVE direction, the sliding roof can be slid and tilted continuously.OK:
The slide roof operates normally.
- OK : Proceed to next circuit inspection shown in PROBLEM SYMPTOMS TABLE .
- NG : go to next step
- Check voltage between terminals B, IG and GND of sliding roof control ECU connector.
PREPARATION:
Turn ignition switch ON.
CHECK:
Measure voltage between terminals IG and GND.
OK:
- Voltage: 10 - 14 V
PREPARATION:
- Turn ignition switch OFF.
- Disconnect the sliding roof control ECU connector.
CHECK:
Measure voltage between terminals B and GND.
OK:
- Voltage: 10 - 14 V
- OK : Proceed to next circuit inspection shown on problem symptom table (See PROBLEM SYMPTOMS TABLE ).
- NG : Repair or replace wire harness and connector (See HOW TO USE THE DIAGNOSTIC CHART AND INSPECTION PROCEDURE ).