Inspection Procedure
- Check horn.
PREPARATION:
Connect the battery's positive (+) lead to terminal 1 and negative (-) lead to terminal 2 of the horn connector.
OK:
Horn blows.
- NG : Replace horn.
- OK : Go to next step.
- Check for harness and connector between horn relay and passenger side J/B ECU, and battery and horn relay (See HOW TO USE THE DIAGNOSTIC CHART AND INSPECTION PROCEDURE
).
- NG : Repair or replace harness and connector.
- OK : Proceed to next circuit inspection shown in problem symptoms table (See PROBLEM SYMPTOMS TABLE ).