Transfer Assembly: Inspection
WARNING: This page is about a different variant/trim than selected.
- INSPECT PRELOAD
- Using SST and a torque wrench, measure the preload of the backlash between the driven pinion and ring gear.
SST 09326-20011
Torque: Preload (at starting)
0.30 to 0.53 N*m (3.0 to 5.4 kgf*cm, 2.6 to 4.7 in.*lbf)
- Using SST and a torque wrench, measure the total preload.
SST 09326-20011
Torque: Preload (at starting)
0.49 to 0.86 N*m (5.0 to 8.8 kgf*cm, 4.3 to 7.6 in.*lbf)
- Using SST and a torque wrench, measure the preload of the backlash between the driven pinion and ring gear.
- INSPECT RING GEAR BACKLASH
- Using a dial gauge, check the backlash of the ring gear.
Backlash: 0.10 to 0.18 mm (0.0039 to 0.0071 in.)
If the backlash is not within the specification, adjust the side bearing preload or repair as necessary.
NOTE: Check at least 3 positions on the circumference of the ring gear.
- Using a dial gauge, check the backlash of the ring gear.
- INSPECT TOOTH CONTACT BETWEEN RING GEAR AND DRIVE PINION
- Coat 3 or 4 teeth at the 4 different positions on the ring gear with red read.
- Rotate the ring gear, inspect the tooth pattern.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
- INSPECT RUNOUT OF RING GEAR
- Place the transfer ring gear mounting case on the V-block.
- Using a dial gauge, check the runout of the ring gear.
Maximum runout: 0.06 mm (0.0024 in.)
- INSPECT TRANSFER RING GEAR MOUNTING CASE
- Place the transfer ring gear mounting case on the V-block.
- Using a dial gauge, check the runout of the ring gear.
Maximum runout: 0.14 mm (0.0055 in.)