Transmission Control Cable Assembly: Installation
- INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY
- Install the retainer to the shift cable.
- Pull in the control cable assembly to the body.
- Install the 2 bolts.
Torque: 5.0 N*m (50 kgf*cm, 44 in.*lbf)
- Install the control cable to the shift lever plate.
- Connect the control cable end to the floor shift assembly.
HINT:
Install it with the uneven surface facing up.
- Install the control cable with the 2 nuts to the body.
Torque: 5.0 N*m (50 kgf*cm, 44 in.*lbf)
- Connect the control cable to the control cable support.
- Temporarily install the control cable to the control shaft lever with nut.
- Install the control cable with the clip to the bracket.NOTE: Insert the cable securely.
- INSTALL AIR CLEANER ASSEMBLY WITH HOSE
Torque: 7.0 N*m (71 kgf*cm, 62 in.*lbf)
- INSTALL FRONT FLOOR HEAT INSULATOR NO.1
- Install the heat insulator with the 3 nuts.
Torque: 5.0 N*m (50 kgf*cm, 44 in.*lbf)
- Install the heat insulator with the 3 nuts.
- INSTALL EXHAUST PIPE ASSEMBLY FRONT
HINT:
(See INSTALLATION )
- INSTALL FLOOR PANEL BRACE FRONT
- Install the floor panel brace with the 2 nuts.
Torque: 30 N*m (302 kgf*cm, 22 ft/lbf)
- Install the floor panel brace with the 2 nuts.
- INSTALL OXYGEN SENSOR CONNECTOR
- Connect the oxygen sensor connector.
- Install the floor carpet and foot rest.
- INSTALL AIRBAG SENSOR ASSEMBLY CENTER
SST 09249-63010
- ADJUST SHIFT LEVER POSITION (See ADJUSTMENT )
- INSPECT SHIFT LEVER POSITION (See ADJUSTMENT )
- INSPECT SRS WARNING LIGHT
HINT:
(See CHECK MODE PROCEDURE )