Inspection Procedure
- CHECK DOOR LOCK OPERATION
- Check door lock operation (See HOW TO PROCEED WITH TROUBLESHOOTING ).
NG: REPLACE DOOR LOCK
OK : Go to Next Step
- CHECK HARNESS AND CONNECTOR (TVIP ECU - DOOR LOCK)
- Disconnect the TVIP ECU and door lock connector.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
RESISTANCE SPECIFICATIONTester Connection Specified Condition L2 (T3-16) - D11-9 Below 1 Ω UL3 (T3-17) - D11-10 Below 1 Ω L2 (T3-16) - D12-6 Below 1 Ω UL2 (T3-18) - D12-5 Below 1 Ω
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK : Go to Next Step
- CHECK HARNESS AND CONNECTOR (DOOR LOCK - BODY GROUND)
- Disconnect the door lock connectors.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
RESISTANCE SPECIFICATIONTester Connection Specified Condition D11-7 - Body ground Below 1 Ω D12-8 - Body ground Below 1 Ω
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK : REPLACE TVIP ECU