Charging System (1ZZ-FE): Generator: Installation
- INSTALL GENERATOR ASSEMBLY
- Install the generator with the 2 bolts.
Torque:
Bolt A
25 N*m (250 kgf*cm, 18 ft.*lbf)
Bolt B
54 N*m (550 kgf*cm, 40 ft.*lbf)
- Connect the A/C connector [B].
- Install the wire harness clamp [C].
- Connect the generator connector [D].
- Install the generator wire with the nut [E].
Torque: 9.8 N*m (100 kgf*cm, 7 ft.*lbf)
- Install the terminal cap No. 2.
- Install the generator with the 2 bolts.
- INSTALL FAN AND GENERATOR V BELT
(See REMOVAL )
- INSTALL ENGINE UNDER COVER RH
- CONNECT BATTERY NEGATIVE TERMINAL
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)