LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Toyota >> 2007 >> RAV4 2WD L4-2.4L (2AZ-FE) >> Repair and Diagnosis >> Powertrain Management >> Computers and Control Systems >> Main Relay (Computer/Fuel System) >> Testing and Inspection >> Circuit Opening Relay
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Circuit Opening Relay

ON-VEHICLE INSPECTION

1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

CAUTION: Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to prevent airbag and seat belt pretensioner activation.

2. INSPECT INSTRUMENT PANEL JUNCTION BLOCK

NOTE: The circuit opening relay is built into the instrument panel junction block.







a. Measure the resistance between the terminals.

If the result is not as specified, replace the instrument panel junction block.

3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL