Inspection Procedure
This troubleshooting procedure is based on the premise that the engine is started. If the engine is not started, proceed to PROBLEM SYMPTOMS TABLE .
- PERFORM ACTIVE TEST BY INTELLIGENT TESTER OR TECHSTREAM (FUEL PUMP)
- Connect the intelligent tester or Techstream to the DLC3.
- Turn the ignition switch ON and turn the tester ON.
- Enter the following menus:
- Intelligent tester - Select: DIAGNOSIS / ENHANCED OBD II / ACTIVE TEST / FUEL PUMP /SPD.
- Techstream - Select: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump / Speed.
- Check whether operating sounds can be heard while operating the relay using the tester.
OK: Operating sounds can be heard from relay.
NG: Go to step 4
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (FUEL PUMP ECU - ECM, BODY GROUND)
(see INSPECTION PROCEDURE
)
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: Go to next step
- INSPECT FUEL PUMP ECU (FPC SIGNAL)
(see INSPECTION PROCEDURE
)
NG: REPLACE ECM (see REMOVAL )
OK: REPLACE FUEL PUMP ECU (See REMOVAL )
- INSPECT CIRCUIT OPENING RELAY (C/OPN)
(see INSPECTION PROCEDURE
)
NG: REPLACE CIRCUIT OPENING RELAY (C/ OPN) (see ON-VEHICLE INSPECTION )
OK: Go to next step
- INSPECT CIRCUIT OPENING RELAY (POWER SOURCE VOLTAGE)
(see INSPECTION PROCEDURE
)
NG: Go to step 11
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (CIRCUIT OPENING RELAY (C/OPN) - ECU, FUEL PUMP ECU)
(see INSPECTION PROCEDURE
)
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (FUEL PUMP - FUEL PUMP ECU)
(see INSPECTION PROCEDURE
)
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: Go to next step
- INSPECT FUEL PUMP
- Inspect the fuel pump (see INSPECTION ).
NG: REPLACE FUEL PUMP (See REMOVAL )
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (FUEL PUMP ECU - ECM, BODY GROUND)
(see INSPECTION PROCEDURE
)
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: Go to next step
- INSPECT FUEL PUMP ECU (FPC SIGNAL)
(see INSPECTION PROCEDURE
)
NG: REPLACE ECM (see REMOVAL )
OK: REPLACE FUEL PUMP ECU (See REMOVAL )
- CHECK HARNESS AND CONNECTOR (CIRCUIT OPENING RELAY (C/OPN) - IGN FUSE, INTEGRATION RELAY)
(see INSPECTION PROCEDURE
)
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: Go TO ECM POWER SOURCE CIRCUIT