Inspection Procedure
- CHECK DTC
- Turn the ignition switch to the ON position, and wait for at least 10 seconds.
- Check the DTCs (See DTC CHECK / CLEAR
).
Result:
A:
DTCs B1771 and B1795 are output.
B:
DTC B1795 is output.
HINT:
Codes other than DTC B1771 and B1795 may be output at this time, but they are not related to this check.
A: Go TO DTC B1771
B: Go to next step
- CHECK FUSE
- Measure the resistance of the ECU-B fuse.
Standard resistance:
Below 1 Ω
NG: REPLACE FUSE
OK: Go to next step
- Measure the resistance of the ECU-B fuse.
- CHECK WIRE HARNESS (SOURCE VOLTAGE)
- Turn the ignition switch to the LOCK position.
- Disconnect the negative (-) terminal cable from the battery.
- Disconnect the connector from the occupant classification ECU.
- Connect the negative (-) terminal cable to the battery.
- Turn the ignition switch to the ON position.
- Measure the voltage according to the value(s) in the table below.
Standard voltage
TESTER CONNECTION SPECIFIED VOLTAGE CONDITIONTester connection Condition Specified condition O4-1 (+B) - Body ground Always 10 to 14 V O4-7 (IG) - Body ground Ignition switch ON 10 to 14 V - Turn the ignition switch to the LOCK position.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
TESTER CONNECTION SPECIFIED RESISTANCE CONDITIONTester connection Condition Specified condition O4-3 (GND) - Body ground Always Below 1 Ω
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
NG: REPAIR OR REPLACE WIRE HARNESS
OK: Go to next step
- REPLACE OCCUPANT CLASSIFICATION ECU
- Turn the ignition switch to the LOCK position.
- Disconnect the negative (-) terminal cable from the battery.
- Replace the occupant classification ECU (See REMOVAL
).
HINT:
Perform the inspection using parts from a normal vehicle if possible.
NEXT: Go to next step
- PERFORM ZERO POINT CALIBRATION
- Connect the negative (-) terminal cable to the battery.
- Connect Techstream to the DLC3.
- Turn the ignition switch to the ON position.
- Using Techstream, perform "Zero point calibration" (See INITIALIZATION
).
OK:
The "COMPLETED" is displayed.
NEXT: Go to next step
- PERFORM SENSITIVITY CHECK
- Using Techstream, perform "Sensitivity check" (See INITIALIZATION
).
Standard values:
27 to 33 kg (59.52 to 72.75 lb)
NEXT : END
- Using Techstream, perform "Sensitivity check" (See INITIALIZATION
).