Throttle Body: Installation
- INSTALL THROTTLE BODY
- Install a new throttle body gasket to the intake air surge tank.
- Install the throttle body with the 4 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the 2 water by-pass hoses.
- Connect the throttle body connector and clamp.
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY (See INSTALLATION )
- ADD ENGINE COOLANT (See REPLACEMENT )
- INSPECT FOR COOLANT LEAK (See COOLING SYSTEM )
- INSTALL OUTER COWL TOP PANEL SUB-ASSEMBLY (See INSTALLATION )
- INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY (See INSTALLATION )
- INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH (See INSTALLATION )
- INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH (See INSTALLATION )
- INSTALL V-BANK COVER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL NO. 1 ENGINE UNDER COVER (See INSTALLATION )
- INSTALL ENGINE UNDER COVER ASSEMBLY (See INSTALLATION )