LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Toyota >> 2009 >> Highlander Sport, AWD >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System (2GR-FE) - System And Component Testing, Removal, Inspection And Installation >> Active Control Engine Mount >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Active Control Engine Mount: Installation

  1. INSTALL FRONT ENGINE MOUNTING INSULATOR ASSEMBLY 
    1. Install the front engine mounting insulator assembly with the 3 nuts and cap.

      Torque: 52 N*m (530 kgf*cm, 38 ft.*lbf) 

      Fig 1: Locating Front Engine Mounting Insulator Assembly With Nuts And Cap
      G05414022Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Connect the duty vacuum switching valve connector and clamp.
      Fig 2: Locating Duty Vacuum Switching Valve Connector And Clamp
      G05414007Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Install the 2 clamps.
      Fig 3: Locating Vacuum Hose Sub-Assembly Clamps
      G05413997Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Connect the vacuum hose sub-assembly to the air cleaner cap sub-assembly and vacuum switching valve.
      Fig 4: Locating Vacuum Hose Sub-Assembly
      G05413996Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL TRANSVERSE ENGINE MOUNTING BRACKET 
    1. Install the transverse engine mounting bracket with the 3 bolts and nut.

      Torque: 64 N*m (653 kgf*cm, 47 ft.*lbf) for 3 Bolts 

      87 N*m (887 kgf*cm, 64 ft.*lbf) for Nut 

      Fig 5: Locating Transverse Engine Mounting Bracket With Bolts And Nut
      G05414016Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  3. INSTALL RADIATOR ASSEMBLY AND FAN ASSEMBLY WITH MOTOR  (See INSTALLATION )
  4. INSTALL COOLER CONDENSER ASSEMBLY  (See INSTALLATION )
  5. INSTALL UPPER RADIATOR SUPPORT SUB-ASSEMBLY  (See INSTALLATION )
  6. INSTALL HOOD LOCK ASSEMBLY (w/o Engine Hood Courtesy Switch)  (See INSTALLATION )
  7. INSTALL HOOD LOCK ASSEMBLY (w/ Engine Hood Courtesy Switch)  (See INSTALLATION )
  8. INSTALL RADIATOR GRILLE  (See INSTALLATION )
  9. CONNECT COOLING FAN ECU CONNECTOR  (See INSTALLATION )
  10. CONNECT OIL COOLER HOSE  (See INSTALLATION )
  11. CONNECT NO. 2 RADIATOR HOSE  (See INSTALLATION )
  12. CONNECT NO. 1 RADIATOR HOSE  (See INSTALLATION )
  13. INSTALL NO. 1 AIR CLEANER INLET  (See INSTALLATION )
  14. INSTALL NO. 2 AIR CLEANER INLET  (See INSTALLATION )
  15. INSTALL BATTERY  (See INSTALLATION )
  16. INSTALL COOL AIR INTAKE DUCT SEAL  (See INSTALLATION )
  17. ADD ENGINE COOLANT  (See REPLACEMENT )
  18. INSPECT FOR COOLANT LEAK  (See COOLING SYSTEM )
  19. INSPECT AUTOMATIC TRANSAXLE FLUID 

    HINT:

    See AUTOMATIC TRANSAXLE FLUID

  20. INSPECT FOR OIL LEAK 
  21. INSTALL NO. 1 ENGINE UNDER COVER  (See INSTALLATION )
  22. INSTALL ENGINE UNDER COVER ASSEMBLY  (See INSTALLATION )
  23. INSTALL V-BANK COVER SUB-ASSEMBLY  (See INSTALLATION )