Section 5 (Charging System (2AZ-FE)): Generator: Installation
WARNING: This page is about a different variant/trim than selected.
- INSTALL GENERATOR ASSEMBLY
- Install the wire harness clamp bracket with the bolt.
Torque: 8.4 N*m (86 kgf*cm, 74 in.*lbf)
- Install the generator assembly with the 2 bolts.
Torque: Bolt A
21 N*m (215 kgf*cm, 16 ft.*lbf)
Bolt B
52 N*m (530 kgf*cm, 38 ft.*lbf)
- Install the generator connector and 2 wire harness clamps.
- Install the wire harness to terminal B with the nut and install the terminal cap.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- Install the wire harness clamp bracket with the bolt.
- INSTALL V-RIBBED BELT (See INSTALLATION )
- INSTALL ENGINE UNDER COVER RH
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL