LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Toyota >> 2009 >> RAV4 Base, 3.5 K, AWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 15 (Engine Control System (2AR-FE) - Service Information & Circuit Tests) >> Circuit Opening Relay >> On-Vehicle Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

On-Vehicle Inspection

WARNING: This page is about a different variant/trim than selected.
  1. INSPECT INSTRUMENT PANEL JUNCTION BLOCK (C/OPN RELAY) 
    NOTE: The circuit opening relay is built into the instrument panel junction block.
    1. Measure the resistance of the circuit opening relay circuit.
      Fig 1: Identifying Instrument Panel Junction Block
      G05997223Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      1. Measure the resistance according to the value(s) in the table below.

        Standard Resistance 

        TESTER CONNECTION SPECIFIED CONDITION CHART

        Tester Connection Condition Specified Condition
        1B-11 - 1A-8 Battery voltage is not applied to terminals 1E-5 and 1D-1 10 kΩ or higher
        1B-11-1A-8 Battery voltage is applied to terminals 1E-5 and 1D-1 Below 1 Ω

        If the result is not as specified, replace the instrument panel junction block.