LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Toyota >> 2009 >> Sienna LE, AWD >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Engine Control System - System & Component Testing, On-Vehicle Inspection, Removal, Inspection & Installation >> Circuit Opening Relay >> Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Circuit Opening Relay: Inspection

  1. INSPECT CIRCUIT OPENING RELAY 
    1. Using an ohmmeter, measure the resistance according to the value (s) in the table below.

      Standard resistance 

      RESISTANCE SPECIFIED CONDITIONS

      Tester Connection Specified Condition
      3 - 5 10 kΩ or higher
      3 - 5 Below 1 Ω
      (Apply battery voltage between terminals 1 and 2)
      Fig 1: Identifying Relay Circuit With Terminal
      G04942983Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      If the result is not as specified, replace the relay.